Vape Coil spares: for resale
We ship vape coils to distributors, chain buyers and independent shops. What follows is the material we normally cover in a first conversation: what we hold in stock, how we test it, how it ships, and what happens when a carton arrives damaged.
Published 12 April 2025 · VapeWholesaleHub · Reading time 5 min
Shipping without surprises
This page is for online vape stores who want a working answer on specification, price and lead time before they commit a purchase order. We have written the detail down so nobody has to sit through a sales call to extract it.
We can consolidate mixed orders of vape coils into one shipment. Consolidation saves freight but adds handling days, so we quote both a consolidated and a split option and let you choose.
We ship from Shenzhen and Guangzhou: air express for samples and part loads, sea freight for volume. Typical production lead time is 25 working days after artwork approval, plus transit. We quote both routes so you can see the trade-off instead of guessing at it.
Unit price versus landed cost
We publish a realistic band of 0.63 to 2.29 per unit for standard configurations at 60 units. Below that band you are buying a lighter specification; above it you are paying for finish, packaging or a smaller run.
Unit price breaks usually land at 60, 240 and 480 pieces. Between those steps the cost curve flattens, which is why pushing a 200 unit order to 500 often costs less per unit than buyers expect.
The reorder is the real test
Reorders are the real test of a supplier. If the second shipment does not match the first, the relationship is over regardless of price, so we treat the reorder as the actual deliverable.
We keep the specification sheet for every order on file. Two years later, when a customer asks whether a pod is compatible, the answer is a lookup rather than a guess.
- Private label files archived for future rebrands
- Consolidated or split shipping, quoted both ways
- Batch codes traceable from carton back to production date
- Specification locked in writing before production starts
- Standing reorder schedule with a fixed cut-off
- Artwork proof plus physical dummy for custom packaging
Quality control, in plain terms
8 separate checks run before a carton is sealed: electrical, mechanical, leak, finish and packaging. Anything outside tolerance is quarantined the same day and reported to you, rather than shipped with a hope and a discount.
Leak complaints almost always trace back to one of three things: an over-torqued centre post, a seal that sat in a hot container, or a fill volume pushed past the design limit. We cap fill volume slightly below maximum for exactly that reason.
Specification summary
| Resistance | 0.60 ohm |
| Build | Mesh |
| Wicking | Organic cotton |
| Fitment | Threaded |
| Pack size | 3 per pack |
| Compatibility | Universal deck |
| Minimum order | 200 units per SKU, mixed cartons allowed |
| Lead time | 22 working days after artwork approval |
None of this is complicated. It is just written down, which is more than most buyers get before they wire a deposit.
Frequently asked
What is the minimum order for vape coil?
Standard configurations start at 60 units per SKU, with mixed SKUs allowed inside the same carton. Custom colours, custom packaging or a private label run usually start at 240 units because of setup time on the line.
How do you handle repeat orders?
The specification is held on file against your account, so a reorder is a reference rather than a new brief. We recommend a standing schedule with a fixed weekly cut-off so stock lands before the shelf empties.
What happens if part of the order is defective?
Report within seven days with photos and the batch code. Confirmed defects are replaced or credited on the next shipment. The failure is logged by mode and batch, and reviewed monthly with the factory.
Related reading
Need a quotation on vape coils?
Send destination market, target price and quantity. Same-day reply on working days.
Tel / WeChat / WhatsApp +86 13711127975 · vape@0099933.xyz